You have been automatically redirected from mobile version of OneJp based on properties of your device.
In case you want to avoid redirection in the future, clicking on the mobile version icon in the footer will remember your preference.

Your preference of desktop version has been remembered.

Time:
New York — 9:11
London — 14:11
Tokyo — 22:11
Currency rates:
$ 1 = ¥ 145.66
We accept:
PayPal
En
Ru
We will assist
to ship goods from
Yahoo! Japan Auction
—  
 
 
If any problem, call us:
+81 (50) 580-66548
Connect with us:
Send us an email Follow us on Twitter Connect with us in Facebook
Examples: Guitar, Transformer, Tires, Lamp

Cookies must be enabled the site to operate property!

A833 California EV side guard left and right motoogucci 1100 California
Auction ends 23 hours
Bidsno
Current price ¥7,998 $56
Start price ¥7,998 $56
Buy-now ¥7,999 $56
Consumption tax 10% not included
Seller nefertitist +47500
Condition Used
Start time 2024-04-21T21:30:57+09:00
End time 2024-04-28T21:30:57+09:00
Auto-prolongation Turned on
Lot number b1074466907
Seller position Tokyo

Cost estimation

Lot
Currency
Price
Tax
Weight

kg

Shipping
Method
From Japan
To loading...

Fees & Total
Tax

System fee

Bank transfer

Total

The parts removed from the following vehicles [California EV]HereBut have sent. otherHereBut we are exhibiting California parts.
Explanation of the car body before disassembly.
Body number ZGUKDC1KD1M1802 ** Registration of the first year August 2005
Type KD motor type KD
  
The start of the engine has been confirmed. The validity period of the vehicle inspection will be the parts of the body that remained until July 4th year.. The mileage display value of the meter is 53161km. The description of the travel distance meter display value for the vehicle verification is 52800km (2nd year) 52400km (2018)..Electrical equipment will be no claim. Detail isHerePlease see. Shipping feeHerePlease see.
Regarding the dimensions of OrleansHerePlease see. Regarding the dimensions of the brake discHerePlease see. Regarding the confirmation of the curvature of the front forkHerePlease see. Regarding the measurement of the degree of runout of the wheel and disk rotorHerePlease see.

Used-new bike parts shop ST engine

中古・新品 バイクパーツショップ STエンジン

Used-new bike parts shop ST engine

連休のお知らせ

◆ Please be sure to read. ◆

Shipping, please see here. Business days, please see here.

Notes

  • The e -mail sent from us may be moved to a folder such as spam or rejecting it.
    Sorry to trouble you, but please cancel or set the domain..
  • After a successful bid haggling act, specify the shipping company, it refuses firmly the shipment of freight collect.
  • Questions about measurements such as diversion and dimensions Please refrain from. Please be sure to ask questions before bidding. 【Since products are kept in warehouse, it will take some time to reply. ]
    [Answer to your question of dimensions and the like, we will refrain. 】
  • Closed date will be Saturday, Sunday and public holidays. New Year, Golden Week, Obon etc
    Please refer to the calendar for the holiday period.

Payment method

  • We do not deliver directly at the store.
  • PayPay Bank
  • Yahoo! easy settlement
  • It becomes only COD [cash. 】 (Please bear the cash on delivery handling fee. )

About transaction method · other notes

  • Shipping will be sure of until the day that I received the reply of payment and shipping destination (3 pm. ). Please understand that we can not do shipment on the same day.
  • All new article and when there is no description of the unused the product for you becomes a used article. Please bid it after understanding the nature of second-hand goods.
  • Used article, I will consider it as a no claim no return except for the described erroneous such as manufacturers and conformity vehicle type.
  • In the case of new unused available upon return only dispatch of initial failure described Miss wrong items. The correspondence of the claim will be one week from the arrival date of the successful bid. Please be sure to contact us within one week. We will refund the amount of money obtained by adding the transfer fee to the amount who transfer money.
  • Receipt please use the settlement refrain refrain from the transfer because it does not issue.
  • As soon as confirmation of payment or Yahoo! easy settlement of accounts, you will be sent by e-mail to contact us date of shipment from our company.
  • Since parts such that you have sent is I am not doing, such as cleaning, washing, please understand that there is attached, such as dirt and oil. (For shipping at the time also business simplification, cleaning cleaning we have let omitted).
  • When it becomes the other in the sale are subject to perform the cancellation before the end time.
  • With regard to the content that can be confirmed by the posted image (stockout etc of state and accessories parts of the product) it has been omitted.

Business day calendar

休業日

Shipping List

  • Shipping will be priority is a larger numerical value of weight or three sides meter (length, width, and height).
  • In regard to engine-frame times the rate that includes the packing, etc.
  • Pallet weight that was required, such as an engine will be shipped Seino Transportation.
carriage
TOP
loading...
TimeUserPrice
No bids
loading...

No questions yet. To ask a question you need to be authorized.
Please, sign in or register. Refresh the page once done.