Auction ends | 2 days |
Bids | no |
Current price | ¥9,980 $69 |
Start price | ¥9,980 $69 |
Buy-now | ¥9,980 $69 |
Consumption tax | 10% not included |
Seller | taiukun +2752 |
Condition | New |
Start time | 2024-04-26T05:23:18+09:00 |
End time | 2024-05-03T05:23:18+09:00 |
Auto-prolongation | Turned off |
Lot number | g1116831878 |
Seller position | Tokyo |
"Building / Civil Engineering Management Data Pro" is a collection of construction management data used by construction management specialists.. It will be possible to significantly reduce the creation time of documents from before the start of various construction construction to the end of completion.. Most data is created by Excel, so it can be easily operated by PC beginners.. In addition, since the method of creation is also described, it is a collection of data that people who are not used to document creation and on -site management should use it.. [List of recording contents]
1 "Construction plan by engine"
1-1 "Construction process checklist"
2 "Procedures for government agencies, use roads, specific work notifications"
3 "Contracted documents / agents / career / process list etc."
4 "Subcontractor Notification"
5 "Construction industry retirement allowance mutual aid project"
6 "Division of the construction system"
7 "Promotion of recycling resource use / implementation book"
8 "Final documents and others"
9 "Construction system ledger / re -subcontracting notice"
10 "Construction Meeting Book"
11 "Create construction documents"
12 "Material confirmation"
13 "Stage confirmation form"
14 "Documents to be prepared by the start of construction"
15 "Documents to be submitted by the start of construction"
16 "Procedures to the Labor Standards Inspection Office"
17 "Documents you want to prepare before the construction start"
18 "Disaster Prevention Council / Safety Training"
19 "Touring / Hiyari Hat / Other Inspection Table"
20 "Daily / monthly report schedule table"
21 "Procedure table"
22 "Documents at contract"
23 "Submission documents submitted by cooperators"
24 "Regulatory signboard"
25 "Construction Complete Report"
26 "Construction sign / poster"
27 "At the time of bringing in"
28 "Signs / posters presented around the surroundings"
29 "Confirmation / Advancement application"
30 "Regular independent inspection / legal qualification"
31 "Working procedure"
32 "Safety seal"
33 ". Documents that I do not want to make, accidents, accidents reports"
34 "Safety points"
35 "Various conversion table"
36 "Calculation table"
37 "Steel material net rate calculation"
38 "Unit weight / weight calculation book"
39 "Weekly step table"
40 "Quantity Control Table"
41 ". Coordinate value, heron area, radiant traverse, surveying"
42 ". Scaffolding books, elevation equipment, hanging legs, cross -sectional views"
43 "Quality formation management table"
44 "In -house inspection quality / certificate"
45 "Estimate condition confirmation sheet"
・ Creating a construction plan for creating a construction plan
Operating environment 1 (PC software) | |
OS |
Microsoft Windows10 |
Microsoft Office |
Microsoft Office2016 (32/64bit) |
CPU |
The smallest clock of each OS |
memory |
Windows 10 4GB or more (8GB or more is recommended) |
display |
Display resolution that can be connected to the main unit and supports the above OS: 1280 x 1024 or more |
Disk drive |
DVD multi -drive recommendation |
* Samples for operation confirmation are also available, so please feel free to contact us..
Notes | |
Products to be delivered |
It will be sold only for package products. (Downloaded version is also available for free) ・ Data CD or DVD and setting manual are packaged in the toll case case. |
Range of use |
Construction management data softwareUsage range in -houseWill be. |
Prohibited matter |
Prohibition of unauthorized duplication and resale |
About return |
Returns after opening are not possible due to information data, but defective products will be returned or exchanged.. |
About corrections |
This product may be upgraded without notice.. Please note that in that case, it may be possible to upgrade for free and may not be so.. |
Disclaimer |
We cannot be liable for any damages or losses using this data.. |
Other |
Please contact us if you have any questions. |
Time | User | Price |
No bids | ||