You have been automatically redirected from mobile version of OneJp based on properties of your device.
In case you want to avoid redirection in the future, clicking on the mobile version icon in the footer will remember your preference.

Your preference of desktop version has been remembered.

Time:
New York — 7:25
London — 12:25
Tokyo — 20:25
Currency rates:
$ 1 = ¥ 145.15
We accept:
PayPal
En
Ru
We will assist
to ship goods from
Yahoo! Japan Auction
—  
 
 
If any problem, call us:
+81 (50) 580-66548
Connect with us:
Send us an email Follow us on Twitter Connect with us in Facebook
Examples: Guitar, Transformer, Tires, Lamp

Cookies must be enabled the site to operate property!

Please for safety documents ★ Building work ★ Work procedure ★ Work standard ★
Auction ends over
Bidsno
Current price ¥5,000 $35
Start price ¥5,000 $35
Buy-now ¥8,000 $56
Consumption tax 0% included
Seller qa888qa +675
Condition New
Start time 2024-04-25T18:12:17+09:00
End time 2024-04-28T18:12:17+09:00
Auto-prolongation Turned on
Lot number h1083964673
Seller position Osaka prefecture

Cost estimation

Lot
Currency
Price
Tax
Weight

kg

Shipping
Method
From Japan
To loading...

Fees & Total
Tax

System fee

Bank transfer

Total

Building work procedure (work standard)
Product Details In addition to work procedures, key points and key points, the expected disasters, safety measures, and related laws and regulations. It is easy to understand and easier to see because it has an illustration. Since it is created by word, you can fix and add according to your own construction. The construction method attached to the construction plan and safety documents was created as a word.
Product content [01 Piles hit]│├01 Benoto method.doc
│├02 Deep -foundation method (human drilling) .doc
│├03 Earth drill method.doc
│├04pc pile driving work .doc
│└05 Pile -uneven core prevention construction guidelines .htm
[02 Land business]│├01 Yamadomo parent pile hitting work (Silent Jack Pressure Working Law) .doc
│ ├02 Yamadori parent pile pulling work.doc
│├03 Yokoya boarding work.doc
│├04 Healing and cut -off work.doc
│ ├05 Healing and cut -off work.doc
│├06 Pier assembly work.doc
│├07 Pier dismantling work.doc
│ ├08 Root Dashing work.doc
│├09 Drainage work.doc
│├10 General excavation work.doc
│├11 Direct -cut work.doc
│├12 Lotus excavation work.doc
│├13 Rock excavation work.doc
│└14 Floating stone removal work.doc
[03 Failure]│├01 New SKT scaffold assembly.doc
│├02 Framework scaffolding work.doc
│├03 Framework dismantling work.doc
│├04 External single pipe assembly work.doc
│├05 External single pipe dismantling work.doc
│├06 One side external scaffold assembly work.doc
│├07 One side external scaffold demolition work.doc
│├08 Rolling Tower Work.doc
│├09 Moving ladder work.doc
│ ├10 Assembly and dismantling work of the overhanging scaffold .doc
│├11 Nene from the middle Scaffolding and dismantling work.doc
│ ├12 Morning glory assembling and demolition work.doc
│├13 Assembly and dismantling work of horsefall fields .doc
│├14 Stepladder Footsteps Work.doc
│├15 External wire mesh installation / removal work.doc
│├16 Opening and removing the curing sheet .doc
│└17 Safety Net Stepping / Removal Work .doc
[04 type frame]│├01 Preparation work.doc
│├02 Pillar wall assembly work.doc
│├03 Liangle floor assembly work.doc
│├04 Other assembly work.doc
│└05 Demolition work.doc
[05 Reinforced]│├01 Foundation assembly work.doc
│├02 Pillar assembly work.doc
│├03 Wall assembly work.doc
│ ├04 Liangle Gumi Work.doc
│ ├05 Slab assembly work.doc
│├06 Other assembly work.doc
│└07 Pillars / beam control muscle pressing work.doc
[06 steel frame]│├01 Anchor bolt mounting / bass mortar coating .doc
│├02 Work on the steel frame.doc
│├03 Restoration work .doc
│├04 High power bolt main work.doc
│├05 Welding work.doc
│├06 Deck plate lining work.doc
│├07 Sky hanger assembly work.doc
│└08 Sky hanger demolition work.doc
[07 concrete cast]│├01 Planning work.doc
│└ Plating manual .xls
[08 is hanging]│├01 General work .doc
│├02 Pile head processing (PC pile) work.doc
│└03 Pile head processing (earth drill pile) work.doc
[10 opening]│ ├01 Opening Creating work.doc
│ ├02 Work of loading from the opening.doc
│└03 Work on the roof.doc
[11 handling and transportation]│├01 Ball hanging work.doc
│├02 General handling work.doc
│├03 How to carry heavy objects .doc
│├04 How to carry a long thing .doc
│├05 How to put things and how to load .doc
│└06 Chem block usage work.doc
[12 machines]│├01 Clorola crane assembly work.doc
│├02 Clorola crane dismantling work.doc
│├03 Universal lift assembly / demolition work.doc
│├04 Polic lane assembly / dismantling work.doc
│├05 Long Span Elevator Assembly and Demolition work.doc
│├06 Pilo Jumbo Climbing Work .doc
│├07 Moving hydraulic truck crane driving work.doc
│├08 Electric winch use work.doc
│├09 Bulldoza operation work.doc
│├10 Shovel driving work.doc
│└11 Clamshell operation .doc
[13 Electric]│├01 Sleeveing ​​.doc
│├02 Building piping.doc
│├03 Slab piping.doc
│├04 Society partition wiring .doc
│ ├05 PS in -pipe.doc
│├06 Trunk line .doc
│ ├07 Lightning rod work.doc
│└08 Underground burial work.doc
[14 air conditioning / hygiene]│├01 Underground beam sleeve construction.doc
│├02 floor sleeve insert construction.doc
│├03 Under the floor pit work.doc
│├04 PB hanging work.doc
│├05 Fresh pipe construction.doc
│└06 External burial work.doc
[15pc / accumulation]│├01 PC version mounting work.doc
│├02 ALC version mounting work.doc
│├03 Span cleating version mounting work.doc
│├04 Omniya version installation work.doc
│└05 Concrete Block Packed work.doc
[16 waterproof]│├01 Urethane coating waterproof work.doc
│└02 Ceiling work.doc
[17 stone / tile]
│├01 Tile pasting work.doc
│└02 Stone pasting work.doc
[18 Thursday]│├01 Wood construction work.doc
│├02 Stud method (partition, ceiling) .doc
│├03 Board tension work.doc
│ ├04 Electric circle cousin work.doc
│├05 Air nailing work.doc
│└06 Stepladder work.doc
[19 roof]
│└01 roof sheet metal work.doc
[20 metal]│├01 Ink out work.doc
│├02 Core removal work.doc
│└03 Mounting work.doc
[21 plasterer]│├01 Floor concrete gold trowel press .doc
│├02 External mortar coating work.doc
│├03 External thin coating work.doc
│├04 Internal mortar coating .doc
│└05 Electric tools used in plastering. Doc
[22 blown]│├01 External blow work.doc
│└02 Indoor blow work.doc
[23 metal tools]│└01 Steel fittings work .doc
[24 wooden fittings]│└01 Wooden fixtures furniture work.doc
[25 glass]│└01 Plate glass mounting work.doc
[26 painting]│└01 Painting work.doc
[27 interior]│├01 Frequent plastic tile and floor length shaku sheet work .doc
│├02 Ceiling / Wall cross -pasted work.doc
│├03 Direct paste flooring work.doc
│ ├04 Electric circle cousin work.doc
│├05 Air nailing work.doc
│└06 Stepladder work.doc
[28 miscellaneous]│└01 hard -foam urethane blowing work.doc
[29 separate table]│├01 Electric Maru Cotton Work -Another Table. Doc
│├02 Air nailing work -another table .doc
│├03 Stepladder Footsteps / Moving Ladder Work -Another Table. Doc
│└04 Rolling Tower -Another Table. Doc
00 What is a work standard? Doc└ Genpon.doc
Payment details

· Yahoo! easy settlement

Shipment details

We will tell you the download link in the transaction message.

No.207.001.001
loading...
TimeUserPrice
No bids
loading...

No questions.