You have been automatically redirected from mobile version of OneJp based on properties of your device.
In case you want to avoid redirection in the future, clicking on the mobile version icon in the footer will remember your preference.

Your preference of desktop version has been remembered.

Time:
New York — 6:51
London — 11:51
Tokyo — 19:51
Currency rates:
$ 1 = ¥ 145.15
We accept:
PayPal
En
Ru
We will assist
to ship goods from
Yahoo! Japan Auction
—  
 
 
If any problem, call us:
+81 (50) 580-66548
Connect with us:
Send us an email Follow us on Twitter Connect with us in Facebook
Examples: Guitar, Transformer, Tires, Lamp

Cookies must be enabled the site to operate property!

Building construction 2 ■ Working procedure with diagrams ■ ★ Construction planning ★ Safety documents ★
Auction ends over
Bidsno
Current price ¥4,000 $28
Start price ¥4,000 $28
Buy-now ¥6,000 $42
Consumption tax 0% included
Seller qa888qa +675
Condition New
Start time 2024-04-25T18:12:10+09:00
End time 2024-04-28T18:12:10+09:00
Auto-prolongation Turned on
Lot number o1088844852
Seller position Osaka prefecture

Cost estimation

Lot
Currency
Price
Tax
Weight

kg

Shipping
Method
From Japan
To loading...

Fees & Total
Tax

System fee

Bank transfer

Total

Operating procedures
Building work procedure
Product Details Payment details Shipment details comment
In addition to work procedures, key points and key points, the expected disasters, safety measures, and related laws and regulations.It is easy to understand and easier to see because it has an illustration. Since it is created by word, you can fix and add according to your own construction. The construction method attached to the construction plan and safety documents was created as a word. A simple figure is inserted, making it easier to understand dangerous parts.
Product Details Payment details Shipment details comment
· Yahoo! easy settlement
Product Details Payment details Shipment details comment
We will tell you the download link in the transaction message.
Product content
Temporary works Soil construction
Work for the assembly of scaffolding, etc.
Framework assembly work
Single pipe scaffold assembly work
Land foot assembly work
Framework dismantling work
Single pipe dismantling work
One -side scaffold dismantling work with bracket
Land feet demolition work
Mountain stop assembly work
Mountain stop dismantling work
Pier assembly work
Pier demolition work
Tower crane assembly work
Tower crane dismantling work
Assembly work of crawler crane boom
Clawer crane boom dismantling work
Long -span elevator assembly work
Dismantment work of long span elevators
Preliminary meetings for excavation workJobs of the chief of excavation work in the mountains
Excavation work
Return work (1)
Return work (2)
Exterior work
Yokoya boarding work
Local business construction Formwork construction
Ready pile casting work (pre -bowling method)
Earth drill pile work
Allcathing pile work
Reverse pile work
Deep foundation pile work
Formal framework assembly / dismantling work preliminary meetings
The duties of the chief of the work such as assembly of form -frame retention
Making work under type frame
Formal framework assembly work (pillars, walls)
Formal framework assembly work (beam, slab)
Formal framework assembly work (shaft, stairs)
Type dismantling work
Rebar construction Steel work
Reinforcement assembly work preliminary meetings
Reinforced factory processing work
Reinforced work
Basic rebar assembly work
Liangy reinforced bar assembly work
Pillar steering steeringen assembly work
Wall -steeper bar assembly work
Slab reinforced reinforced work
Other steep bar assembly work
Reinforced gas pressure pressing work
Working on the steel frame Preliminary meetings
Work such as steel frame assembly
Work in the steel fraction
Section 1 Iron frame construction work
Section 2 or higher construction work
Founding distortion work
Fire -resistant blowing work (half -humid type)
Concrete casting construction Demolition / 斫 construction
Preliminary meetings of concrete casting work
Concrete casting work (concrete pump truck)
Demolition work preliminary meeting
Demolition of concrete structures, such as demolition of work
Relined concrete pile pile head processing work (cutter -cutting method)
Relined concrete pile pile head processing work (hydraulic pressure crushing method)
Place concrete piles pile head processing work (hand blade method)
Concrete building dismantling work (above ground)
Steel -framed building dismantling work (above ground)
Wooden and building dismantling work (above ground)
PC version construction ALC version construction
PC version installation work ALC version Installation Work for Preliminary Meeting
ALC version installation work (outer wall, partition wall, roof, floor)
Waterproofing work Metal construction
Rooftop asphalt waterproof work
Rooftop exposure asphalt waterproof work
Indoor asphalt waterproof work
Lightweight steel frame underground mounting work

loading...
TimeUserPrice
No bids
loading...

No questions.