Large-capacity DC power supply DC Power SUPPLY LME EX-1204A 12V 4A DC stabilization power supply
Auction ends | over |
Bids | no |
Current price | ¥3,249 $23 |
Start price | ¥3,249 $23 |
Consumption tax | 0% included |
Seller | isobe365 +1400 |
Condition | Used |
Start time | 2024-04-25T22:13:44+09:00 |
End time | 2024-04-28T22:13:44+09:00 |
Auto-prolongation | Turned on |
Lot number | 1080219515 |
Seller position | Ishikawa Prefecture |
Thank you for your interest in my auction listing products. Since there is no storage place, I decided to organize the collection products. Both are mass -sales products, but they are now difficult to obtain.. Currently, professional parts mounting services have ended, but some items are installed by professionals.. Professional parts installation services were very useful for inexpensive mass sales products.. If it's true, I don't want to let go of this item, but I decided to exhibit this because the items I decided to let go are quite at hand.. This is a DC Power Supply LME EX-1204A DC stabilization power supply. When converting 100V exchange to a DC, cheap equipment tends to be dirty DC.. Then, if it is an LED bulb, it will be flickering, but it is necessary to use a capacitor and use a powerful DC.. This power supply is not originally for railway models, but it boasts more power and stability for railway models.. It can be used for driving by using power supply to buildings and exhibited vehicles used in the layout and resistance to this.. About operation confirmation
There are only 40cm tracks and TOMIX 5001 power packs, so we do not perform endurance tests.. Motors other than the on the cancer motor cannot be tested due to lack of power pack output.. The expression of the operation means lighting and running the light.. In the case of long -term storage items, we checked the operation by minimal oil, but when running in earnest, a solid maintenance is required.. We do not take responsibility even if you forcibly run with a large capacity power pack for HO.. Please note the following points for the transaction and bid. I will recognize that it was agreed at the time of the bid. Please about product packing
I can't believe it, but I was very tired because there was an order that I could not understand that the HO gauge could be wrapped in a bubble wrap just to keep the shipping cost about 200 yen cheaper.. That person was shipped in that state, but there was no problem. I showed the package to the collected person just in case, but the expected transportation company was laughing and refused to accept it. If the model is broken, if the packaging condition is poor, you will not be able to receive other products.
If you have such an order, bring the highest bidder to the convenience store as a shipping person.. (Of course, it is not guaranteed that the packaging is judged to be insufficient even if the product is damaged. )
If it takes time to place an order after a successful bid, it will also affect the packaging of other products and it will be very troublesome. It is a necessary packing, not over -packing. In the case of old items, it may be painful due to deterioration of the material even if unused. For example, I will write if you can understand at a glance, such as diary cracks and internal rust, etc.
If you have to take a closer look, there is a high possibility that you will miss it.. Therefore, the deterioration of the material will occur regardless of our treatment, so it will be exempted. 1. Cancellation, returned goods, or exchanges after bidding cannot be accepted, so
If you have any questions, be sure to solve it before the end of the auction. (Especially after shipping, we cannot confirm that this part occurs. )
2. There may be differences in memory, but it will be a priority on the actual product.. 3. The deterioration of the material will occur regardless of our handling, so it will be exempted.. 4. If there is no confirmation of operation, if there is no description in the product description, the capacity of the power pack is not insufficient.. 5. There is no guarantee of the operation for the operating products.. 6. From the above, please treat it as a JUNK product and bid at your own risk.. 7. We cannot seek the liability for defect guarantee to us, so it does not respond to complaints.. 8. The standard of the product is referring to Yahoo Auction Help.. 9. After a successful bid, please proceed within the determined period of the auction.. 10. Packing materials are recycled products, so if the material runs out, it may take time..
There are only 40cm tracks and TOMIX 5001 power packs, so we do not perform endurance tests.. Motors other than the on the cancer motor cannot be tested due to lack of power pack output.. The expression of the operation means lighting and running the light.. In the case of long -term storage items, we checked the operation by minimal oil, but when running in earnest, a solid maintenance is required.. We do not take responsibility even if you forcibly run with a large capacity power pack for HO.. Please note the following points for the transaction and bid. I will recognize that it was agreed at the time of the bid. Please about product packing
I can't believe it, but I was very tired because there was an order that I could not understand that the HO gauge could be wrapped in a bubble wrap just to keep the shipping cost about 200 yen cheaper.. That person was shipped in that state, but there was no problem. I showed the package to the collected person just in case, but the expected transportation company was laughing and refused to accept it. If the model is broken, if the packaging condition is poor, you will not be able to receive other products.
If you have such an order, bring the highest bidder to the convenience store as a shipping person.. (Of course, it is not guaranteed that the packaging is judged to be insufficient even if the product is damaged. )
If it takes time to place an order after a successful bid, it will also affect the packaging of other products and it will be very troublesome. It is a necessary packing, not over -packing. In the case of old items, it may be painful due to deterioration of the material even if unused. For example, I will write if you can understand at a glance, such as diary cracks and internal rust, etc.
If you have to take a closer look, there is a high possibility that you will miss it.. Therefore, the deterioration of the material will occur regardless of our treatment, so it will be exempted. 1. Cancellation, returned goods, or exchanges after bidding cannot be accepted, so
If you have any questions, be sure to solve it before the end of the auction. (Especially after shipping, we cannot confirm that this part occurs. )
2. There may be differences in memory, but it will be a priority on the actual product.. 3. The deterioration of the material will occur regardless of our handling, so it will be exempted.. 4. If there is no confirmation of operation, if there is no description in the product description, the capacity of the power pack is not insufficient.. 5. There is no guarantee of the operation for the operating products.. 6. From the above, please treat it as a JUNK product and bid at your own risk.. 7. We cannot seek the liability for defect guarantee to us, so it does not respond to complaints.. 8. The standard of the product is referring to Yahoo Auction Help.. 9. After a successful bid, please proceed within the determined period of the auction.. 10. Packing materials are recycled products, so if the material runs out, it may take time..
Time | User | Price |
No bids | ||
No questions.