You have been automatically redirected from mobile version of OneJp based on properties of your device.
In case you want to avoid redirection in the future, clicking on the mobile version icon in the footer will remember your preference.

Your preference of desktop version has been remembered.

Time:
New York — 6:46
London — 11:46
Tokyo — 19:46
Currency rates:
$ 1 = ¥ 145.82
We accept:
PayPal
En
Ru
We will assist
to ship goods from
Yahoo! Japan Auction
—  
 
 
If any problem, call us:
+81 (50) 580-66548
Connect with us:
Send us an email Follow us on Twitter Connect with us in Facebook
Examples: Guitar, Transformer, Tires, Lamp

Cookies must be enabled the site to operate property!

1/48 US main tank M1A2 Abrams finished product
Auction ends 2 days
Bidsno
Current price ¥8,500 $59
Start price ¥8,500 $59
Consumption tax 0% included
Seller kouaya2824 +621
Condition New
Start time 2024-04-30T20:23:14+09:00
End time 2024-05-03T20:23:14+09:00
Auto-prolongation Turned on
Lot number u1124608009
Seller position Wakayama Prefecture

Cost estimation

Lot
Currency
Price
Tax
Weight

kg

Shipping
Method
From Japan
To loading...

Fees & Total
Tax

System fee

Bank transfer

Total

1/48American main tankM1A2Abrams finished product.
As an improved type of M1 Abrams1985M, whose delivery to the U.S. Army began in the year1A1 is M1Was equipped51Caliber105Powerful rifle gun44Caliber120I was replaced with a glide gun. From the beginning, the M1 tank has been developed on the premise that it will be operated for a long time by gradually enhancing the performance.1988In the year, a high -density of deteriorated uranium was adopted as a composite armor on the turret, and it developed into an M1A1HA that greatly improved defense.. It became a main tank by balancing the attack power, defense power, and mobility at a high level..
2003In the War of the Iraq, M1A2 was first launched in the actual battle, and M1A1HA also played a part of the main unit.. Also2001From around the year, the M1A2 SEP, which has further strengthened electronic equipment and listed GPS, has been introduced in the form of modernization and renovation of M1 and M1A2, and the M1 tanks are increasing their performance.2030It is said that it will stay at the forefront until the age.
In the process of the work, the basic color was painted and the three -dimensional effect and dirt were reproduced..
Next, alcohol dropped to express dust in the desert..
Finally, dirt of oil and rust.
Since it is an amateur work, please use no claim no return.. In addition, we will pay strict precautions for shipping, but if it is damaged, please repair it with the successful bidder.. I would like to respond if it is enormous.
Well, then, I'm looking forward to working with you.
loading...
TimeUserPrice
No bids
loading...

No questions yet. To ask a question you need to be authorized.
Please, sign in or register. Refresh the page once done.